NEW QUESTION 13
Which operations are possible when you cancel the technical completion of a maintenance order? Note:
There are 2 correct Answers to this question.

  • A. Book a goods receipt.
  • B. Change the priority.
  • C. Change the estimated costs.
  • D. Cancel status Released.

Answer: A,B

 

NEW QUESTION 14
Where can the maintenance planner perform a material availability check? Note: There are 2 correct Answers to this question.

  • A. Via the SAP Fiori app "Manage Maintenance Order List"
  • B. Via the SAP Fiori app "Maintenance Scheduling Board"
  • C. Within the SAP Fiori-based background job
  • D. Via the multi-level order list (SAP GUI)

Answer: C,D

 

NEW QUESTION 15
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.

  • A. When an order is created based on a single notification, this notification becomes the header notification.
  • B. The document within the document management system can be assigned only at operational level.
  • C. The assignment of the header notification to an order CANNOT be deleted.
  • D. The long text of the reference notification can be automatically copied as the long text of the order.

Answer: A,D

 

NEW QUESTION 16
Which of the following is a prerequisite for external refurbishment?

  • A. Activate the subcontracting indicator in an external activity.
  • B. Select the material group for externally refurbished materials.
  • C. Create the purchasing info record for the external provider.
  • D. Define the order type for external refurbishment.

Answer: A

 

NEW QUESTION 17
Which statements about the structure indicator are correct? Note: There are 2 correct Answers to this question.

  • A. It defines hierarchy levels of the functional location structure.
  • B. It defines the allowed characters for a functional location.
  • C. It defines which data is transferred to the lower levels of the hierarchy.
  • D. It can have a maximum length of 50 characters.

Answer: A,B

 

NEW QUESTION 18
Which statement is correct about the SAP Fiori tile group? Note: There are 2 correct Answers to this question.

  • A. It is assigned via a portal role.
  • B. It can be assigned directly to the user via personalization.
  • C. It is based on an SAP Fiori tile catalog.
  • D. It provides only SAPUI5-based apps.

Answer: C,D

 

NEW QUESTION 19
Which SAP UI technology is used for the Report and Repair Malfunction app?

  • A. Web Dynpro
  • B. SAP GUI for Windows
  • C. SAPUI5
  • D. SAP GUI for HTML

Answer: A

 

NEW QUESTION 20
Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence?
Note: There are 2 correct Answers to this question.

  • A. SAP Lumira
  • B. SAP Crystal Reports
  • C. Plant Maintenance Information Systems (PMIS)
  • D. SAP QuickViewer

Answer: A,B

 

NEW QUESTION 21
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct Answers to this question.

  • A. Analyze overdue maintenance orders that have NOT been finally confirmed.
  • B. Analyze maintenance orders that are still in planning and have NOT been released.
  • C. Display approved purchase requisitions for which purchase orders have been generated.
  • D. Display approved purchase requisitions for which NO purchase orders have been generated.
  • E. Analyze confirmed maintenance orders that have NOT been settled.

Answer: A,B,D

 

NEW QUESTION 22
Which statements are correct for standard processes in PM/PS cost control? Note: There are 2 correct Answers to this question.

  • A. Budget can be assigned to a WBS element.
  • B. Maintenance costs can be settled to a network operation.
  • C. Maintenance order costs can be settled to a WBS element.
  • D. Budget can be assigned to a maintenance plan.

Answer: A,C

 

NEW QUESTION 23
You want to assign components to an equipment task list. There is no BOM assigned to the equipment.
What is the prerequisite for using the free assignment of material?

  • A. Free assignment of material is always possible without any prerequisites.
  • B. Assign the header material of a material BOM to the equipment task list header.
  • C. Assign the BOM usage for free assignment of material in Customizing.
  • D. Assign the header material of a material BOM as assembly to a task list operation.

Answer: C

 

NEW QUESTION 24
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note:
There are 2 correct Answers to this question.

  • A. Assign an inspection lot to the task list header.
  • B. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
  • C. Assign a piece of equipment with an allocated measuring point to a task list operation.
  • D. Assign an inspection document as a PRT to the task list operation.

Answer: B,C

 

NEW QUESTION 25
Which material type is the best choice if you only want to create a structure element within the BOM?

  • A. Manufacturer Part (HERS)
  • B. Compatible Unit (CBAU)
  • C. Maintenance Assembly (IBAU)
  • D. Spare Part (ERSA)

Answer: C

 

NEW QUESTION 26
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?

  • A. Cycle set sequence
  • B. Lead flow
  • C. Package sequence
  • D. Hierarchy

Answer: D

 

NEW QUESTION 27
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Initial/subsequent buffer
  • B. Scheduling type
  • C. Package offset
  • D. Call horizon

Answer: A

 

NEW QUESTION 28
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

  • A. Shift factor
  • B. Maintenance package offset
  • C. Maintenance plan category
  • D. Scheduling indicator

Answer: B

 

NEW QUESTION 29
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. Planned date of the next call, independent of maintenance order dates
  • B. Actual finish date of the maintenance order
  • C. Planned end date of the maintenance order
  • D. Technical completion date of the maintenance order

Answer: D

 

NEW QUESTION 30
Which parameter in the material master is a prerequisite for refurbishment?

  • A. Valuation category C (condition-based)
  • B. Valuation category B (in-house/external procurement)
  • C. Valuation class 8000
  • D. Valuation type H (origin)

Answer: A

 

NEW QUESTION 31
......