D-VXR-DY-01 Exam Questions - Real & Updated Questions PDF
Pass Guaranteed Quiz 2024 Realistic Verified Free EMC
NEW QUESTION # 25
What categories can be validated by the VxRail NVT?
- A. Network Services, ToR Switches, and VxRail Nodes
- B. Network Services, Upstream Switches, and VxRail Nodes
- C. ToR Switches, Upstream Switches, and VxRail Nodes
- D. Network Services, ToR Switches, and Upstream Switches
Answer: D
NEW QUESTION # 26
When preparing to generate an As-Built Configuration Report, it is determined that the VxRail Configuration JSON file was not saved from the Deployment Wizard.
What actions must be taken to retrieve the JSON file?
- A. Log in to vCenter with the vSphere Client with the vCenter Administration user Go to Configure > VxRail > System Use the Product Documentation option
- B. SSH to the VxRail Manager VM with the mystic user SU to root Go to the /opt/VxRail/config directory SCP the initial-config json file to a local location
- C. Log in to vCenter with the vSphere Client with the vCenter Server Management user Go to Monitor > VxRail > Last Configuration Data Sent Use the Download option
- D. Open an FTP connection to the VxRail Manager VM with the mystic user Go to the /var/lib/vmware-marvin directory GET the config-initial json file
Answer: C
NEW QUESTION # 27
What native logging options are NOT available in the VxRail First Run Wizard?
- A. Log Insight
- B. SNMP
- C. None
- D. Syslog
Answer: B
NEW QUESTION # 28
A customer is configuring VxRail to connect to an existing, external SRS VE. Their support account is associated with the Site ID/Party ID where VxRail is installed. A validation error is issued when the customer attempts to register VxRail in SRS.
What is the possible cause for the error?
- A. Number of deployed devices on SRS gateway has exceeded the maximum
- B. Wrong IP address was used for SRS VE gateway
- C. Status of VxRail in Install Base is 'Shipped'
- D. SRS traffic goes through a proxy server
Answer: C
NEW QUESTION # 29
What guideline should be followed when planning bandwidth between sites hosting VM objects and the witness nodes?
- A. 2 Mbps for every 1000 objects on the vSAN
- B. 1500 MTU on the VSAN vmkernel interface
- C. 5 ms with a recommended minimum bandwidth of 10Gbps
- D. 500 ms roundtrip (< 250 ms one way)
Answer: A
NEW QUESTION # 30
An implementation engineer is in the validation phase of a VxRail deployment with two Dell EMC ToR switches.
Which command should they run on each of the ToR switches to validate that Link Aggregation has been configured according to Dell best practices for VxRail node interfaces?
- A. show network-policy profile
- B. show interface
- C. show interface status
- D. show port-channel summary
Answer: D
NEW QUESTION # 31
A VxRail cluster is being deployed with the VxRail Deployment Wizard.
For which IP addresses must FQDNs be resolved by DNS?
- A. All VxRail ESXi nodes, vCenter Server, and VxRail Manager VM
- B. Only the first VxRail ESXi node, vCenter Server, and VxRail Manager VM
- C. All VxRail ESXi nodes, vRealize Operation Manager, and VxRail Manager VM
- D. vCenter Server and VxRail Manager VM only
Answer: A
NEW QUESTION # 32
You want to deploy VxRail, leveraging your existing VMware SSO domain.
What is the recommended method?
- A. Deploy External vCenter with no PSC
- B. Deploy to an External vCenter
- C. Deploy Embedded vCenter with Embedded PSC
- D. Configure Embedded vCenter in Enhanced Linked Mode
Answer: B
NEW QUESTION # 33
A company is planning to deploy their Virtual Desktop Infrastructure on VxRail. The solution should support 2D and 3D high end visualization.
Which VxRail license is required for this solution?
- A. vSphere Enterprise Plus
- B. vSphere with Operations Management Enterprise
- C. vSphere Enterprise
- D. vSphere Standard
Answer: A
NEW QUESTION # 34
What accurately describes VxRail G Series nodes?
- A. Hybrid and all-flash nodes are permitted if in different chassis.
- B. Different dot releases of the same major release are permitted if in different chassis.
- C. All nodes in a chassis must be identical.
- D. Each chassis must be fully populated.
Answer: A
NEW QUESTION # 35
An implementation engineer is planning to deploy a new VxRail cluster.
How long is the evaluation period for vSphere licensing on each node?
- A. 60 days after nodes are delivered
- B. 90 days after nodes are powered on
- C. 60 days after nodes are powered on
- D. 90 days after nodes are delivered
Answer: C
NEW QUESTION # 36
What is the benefit of using WTS in a VxRail Stretched Cluster implementation?
- A. Service automatically updates the witness appliance
- B. Access to Windows Terminal Services acceleration module
- C. Native implementation of terminal services in a VxRail
- D. Separation of witness traffic from vSAN data traffic
Answer: D
NEW QUESTION # 37
What is the correct Use Case for using VxRail-Managed vCenter Server?
- A. When you have a multi-site Stretch Cluster and no witness.
- B. Second or subsequent cluster deployments or the first cluster in a multi-cluster deployment.
- C. A stand-alone cluster deployment or the first cluster in a multi-cluster deployment.
Answer: C
NEW QUESTION # 38
A Secure Remote Services deployment on a VxRail system with external vCenter fails with Invalid target datastore specified.
What action is required to resolve this problem?
- A. Manually deploy Secure Remote Services
- B. Retry the deployment through the retry button
- C. Ensure DNS is able to resolve the SRS/VE VM hostname
- D. Restart vCenter services and retry the deployment
Answer: A
NEW QUESTION # 39
What Is a supported method for racking nodes for a new VxRail deployment?
- A. With server exhaust facing the cold aisle
- B. With PDUs connected to 120v single phase 5-amp electrical circuits
- C. Starting with node 1 at the top of the rack
- D. In the rack hosting the network equipment used to manage the iDRAC
Answer: C
NEW QUESTION # 40
A VxRail cluster is being installed with Dell ToR switches at a "dark site." The administrator is not able to use the NVT tool.
Which command can they run on the ToR to verify VLANs are created, active, and properly configured on the uplink ports?
- A. show vlan
- B. ping default gateway
- C. show interface status
- D. show port-channel summary
Answer: A
NEW QUESTION # 41
What is required to perform an Internet upgrade of a VxRail cluster?
- A. Enable vSphere Lifecycle Manager
- B. Dell Secure Remote Services
- C. Download Composite Upgrade Metadata .zip files
- D. Dell Technologies Support Account
Answer: D
NEW QUESTION # 42
Which command is used to restart the Loudmouth process on an ESXi node?
- A. systemcti restart loudmouth
- B. systemcti restart vmware-loudmouth
- C. /etc/int.d/loudmouth restart
- D. /usr/IibAmiware/loudmouth/bin/loudmouthd restart
Answer: C
NEW QUESTION # 43
Which two files are used to automate VxRail deployment and validate the network configuration?
- A. Appliance JSON file
PEQ data file - B. Appliance JSON file
SPEQ - C. VxRail Configuration Portal
PEQ data file - D. VxRail Test Plan
SPEQ
Answer: A
NEW QUESTION # 44
View the Exhibit.
You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
- A. Top of Rack (ToR) switches will use two uplink ports
- B. Upstream switches will have two ISLs
- C. Two Upstream switches will be used
- D. Two Top of Rack (ToR) switches will be used
Answer: B
NEW QUESTION # 45
What is the remote management option for G Series VxRail nodes?
- A. iLO
- B. IPMI/BMC
- C. RMM
- D. iDRAC
Answer: B
NEW QUESTION # 46
In a VxRail internal vCenter deployment, which component(s) are automatically licensed?
- A. vCenter and vSAN
- B. vSAN only
- C. None
- D. vCenter only
Answer: B
NEW QUESTION # 47
A company is planning to deploy VxRail for business critical applications. The solution should support automated workload re-balancing.
Which vSphere license is required for this solution?
- A. vSphere Enterprise Plus
- B. vSphere with Operations Management Enterprise
- C. vSphere Enterprise
- D. vSphere Standard
Answer: A
NEW QUESTION # 48
When the Network Services Validation is enabled, what does the VxRail NVT validate?
- A. VLAN configurations and port mode settings
- B. VLAN configurations, NTP, and DNS settings
- C. STP and VLAN configurations
- D. IP address conflicts, NTP, and DNS settings
Answer: D
NEW QUESTION # 49
......
Get to the Top with D-VXR-DY-01 Practice Exam Questions: https://skillsoft.braindumpquiz.com/D-VXR-DY-01-exam-material.html